Project: Really Cool Foods
Location: Indianapolis, IN
In order to meet a fast-track project schedule, Mainstream manufactured these custom built rooftop units which included indirect-fired gas heat on a 6-week production cycle.
The installing contractor was able to install the units and have them commissioned in time to prevent any delays to the project schedule